Konsep Line Balancing dan Six Sigma dalam Proses Pembuatan Tali Polypropylene PT ABC

Authors

  • Nurilia Fitri Prabawati Universitas Islam Kadiri Author

Keywords:

filaments, line balancing, polypropylene, rope, six sigma

Abstract

In this research, the Line balancing and Six Sigma methods were used to study the polypropylene rope production process. This research is supported by the use of real-time data, making it easier for the controlling process to apply the Six Sigma method. The Largest Candidate Rule (LCR) provides an extrusion output value of 93.73 Kg/Hour. Using the assumption of an output share of 9 Kg/hour, to form ropes with diameters of 3mm and 10mm, a composition of 20 filaments is required, 4mm with a composition of 30 filaments, 5mm with a composition of 50 filaments, and 12mm with a composition of 10 filaments.

Downloads

Download data is not yet available.

References

Chase, R. B., Jacobs, F. R., & Aquilano, N. J. (2022). Operations Management for Competitive Advantage (Edisi ke-15). McGraw-Hill Education.

Gartner. (2020). Manufacturing execution systems (MES) magic quadrant.

Hakim, I. M, Zagloel, T. Y. M., & Wulandari, A (2016). Framework Study on Single Assembly Line to Improve Productivity with Six Sigma and Line Balancing Approach. International Scholarly and Scientific Research & Innovation 10 (10). ISNI:0000000091950263.

Kumar, P., & Kant, R. (2020). A review of line balancing methodologies for assembly lines. International Journal of Production Research, 58(7), 1953-1986.

Monk, E., & Wagner, B. (2013). Concepts in Enterprise Resource Planning. Cengage Learning.

Montgomery, D. C. (2023). Introduction to Statistical Quality Control (Edisi ke-8). John Wiley & Sons.

Pande, P. S., Neuman, R. P., & Cavanagh, R. R. (2021). The Six Sigma Way: How GE, Motorola, and Other Top Companies are Honing Their Performance (Edisi ke-2). McGraw-Hill Education.

Pyzdek, T., & Keller, P. A. (2020). The Six Sigma Handbook (Edisi ke-5). McGraw-Hill Education.

Snee, R. D., & Hoerl, R. W. (2021). Six Sigma Beyond the Factory Floor: Deployment Strategies for Financial Services, Health Care, and the Rest of the Real Economy. CRC Press.

Downloads

Published

2024-08-05

How to Cite

[1]
N. F. Prabawati, “Konsep Line Balancing dan Six Sigma dalam Proses Pembuatan Tali Polypropylene PT ABC”, neiit, vol. 1, no. 1, pp. 240–245, Aug. 2024, Accessed: Jul. 04, 2025. [Online]. Available: http://ojs.ft.uniska-kediri.ac.id/index.php/neiit/article/view/67

Similar Articles

You may also start an advanced similarity search for this article.